Observe, record, assign

Make exterior concerns visible before planning repairs.

A repeatable visual review helps property teams describe locations, changes, urgency, and specialist needs more clearly.

Updated August 24, 20264-minute readManaged properties

Use photographs and fixed reference points.

“Crack near the entrance” is hard to track. A dated image, elevation, gridline, measurement, and repeat photo create a useful record.

Entrances and circulation

  • Doors, frames, closers, seals, thresholds, glazing, canopies, lighting, and signage.
  • Steps, ramps, landings, railings, guards, trip points, pavement, and drainage paths.
  • Accessible routes and areas affected by deliveries, snow clearing, or waste movement.

Walls and openings

  • Visible cracks, movement, impact, staining, corrosion, loose material, and failed coatings.
  • Sealants around windows, doors, penetrations, transitions, and dissimilar materials.
  • Signs of water entry inside that may relate to exterior locations.

Water and seasonal change

Record ponding, blocked or damaged drainage, splashback, erosion, ice patterns, and recurring wet areas. Compare observations after rain, freeze-thaw cycles, and snowmelt where safe to do so.

Turn observations into actions

Classify each item as monitor, maintain, repair, investigate, or restrict access. Assign a responsible person and due date. Structural movement, falling-material risk, roofing, major envelope concerns, electrical hazards, and public-safety issues require appropriate qualified assessment.

Safety first: This is a ground-level visual planning checklist. Do not access roofs, elevated areas, electrical equipment, unstable surfaces, or hazardous locations without proper authorization, training, and controls.

Related official information

Toronto notes that property standards apply to building exteriors and common areas. Review the applicable municipal requirements for the property, including Toronto property standards information.