Renovation scheduling

A kitchen timeline begins before demolition.

Selections, drawings, approvals, building access, material lead times, and decision speed can affect the schedule as much as the work itself.

Updated August 24, 20265-minute readHomes, condos & rental units

Use phases instead of one promised duration.

Replacing finishes in an existing layout is different from moving walls, plumbing, electrical, ventilation, or structural components.

A responsible schedule should identify what must be decided and approved before work begins, what is ordered in advance, what is verified after demolition, and what depends on another trade, inspection, or custom fabrication.

Typical planning phases

  1. Scope and measurements: document layout, appliances, cabinets, counters, plumbing, electrical, ventilation, flooring, walls, and finish expectations.
  2. Approvals and documents: confirm condominium rules, municipal requirements, drawings, work hours, access, elevator bookings, and protection.
  3. Selections and procurement: finalize cabinetry, appliances, fixtures, tile, hardware, lighting, paint, flooring, and lead-time items.
  4. Demolition and verification: remove the approved items and confirm concealed conditions before closing the next decisions.
  5. Rough work: complete approved framing, plumbing, electrical, ventilation, and related inspections where required.
  6. Surfaces and fixed finishes: repair walls, prepare floors, install cabinets, template counters, and complete tile or other finishes in the correct sequence.
  7. Fixtures and closeout: connect appliances and fixtures, install hardware and trim, paint, clean, review deficiencies, and document completion.

Common avoidable delays

  • Starting before cabinet, appliance, plumbing, and electrical decisions align.
  • Discovering building rules after the schedule is committed.
  • Ordering custom items after demolition instead of during planning.
  • Unclear responsibility for owner-supplied products or missing pieces.
  • Slow approval of substitutions, concealed conditions, or change orders.

Information that improves the first schedule discussion

Send the property type, city, occupancy, current photos, rough measurements, layout changes, appliance list, building package, target timing, finish level, and whether the kitchen must remain partially usable.