Barrie rental-unit renovation contractor

Rental-unit renovations planned for a clear handover.

Connected kitchen, bathroom, flooring, painting, trim, door, lighting, and repair scopes for Barrie landlords and property-management teams.

Plan the whole unit

Turn a room list into one coordinated scope.

A useful rental-unit plan records the existing condition, required repairs, finish standard, access, decision contacts, material selections, and target handover before work is scheduled.

JT reviews whether the unit is vacant or occupied, which items must be repaired, which finishes should remain consistent with the property, and where measurements or concealed conditions require a walkthrough. The approved scope can then separate required work from optional upgrades and state what is excluded.

Common Barrie unit scopes

Organize connected work without losing the details.

Vacant-unit turnoversCondition review, repairs, paint, flooring, fixtures, doors, trim, cleaning, and final deficiencies.
Kitchens and bathroomsCabinetry, counters, tile, vanities, fixtures, surfaces, ventilation, and qualified-trade coordination where required.
Flooring and finishesSubstrate review, resilient flooring, transitions, baseboards, wall repair, paint, and touch-ups.
Occupied repairsResident-aware access, protection, work-area planning, communication, cleanup, and documented completion.
Completed bathroom in a renovated building unit on Dunlop Street in Barrie

Barrie project evidence

Dunlop Street, documented before and after.

The published case study shows original and completed views of a Barrie building-unit kitchen, bathroom, and interior.

The visible scope connects flooring, paint, trim, doors, lighting, kitchen finishes, and a renewed bathroom surround. It is evidence from one project—not a fixed-price or fixed-timeline promise for another unit.

See the six-part case study →

A useful work order

Include the information that affects scope and access.

01 · Property

Identify the exact area

Provide the address, unit or common area, property type, occupancy, and site contact.

02 · Condition

Record what exists

Attach photos and list damage, prior repair history, measurements, fixtures, and finishes to retain.

03 · Access

Explain constraints

Note resident appointments, keys, parking, loading, work hours, protection, and waste procedures.

04 · Handover

Define ready

State target timing, approval contacts, documentation needs, inspection steps, and final-use expectations.

Barrie rental renovation FAQ

Questions to settle before work begins.

Pricing, schedule, availability, and approval needs are confirmed for the actual unit and written scope.

Can JT coordinate a complete vacant-unit refresh?

Yes. A connected scope can include repairs, kitchen and bathroom finishes, flooring, painting, trim, doors, fixtures, cleaning, and final deficiencies. The exact work is confirmed after the property information and site conditions are reviewed.

What should a Barrie property manager send first?

Send the address and unit, occupancy, access procedure, priority, target timing, condition photos, requested work, known building rules, and the people authorized to approve scope or changes.

Can an occupied unit be repaired?

Occupied work may be possible when the scope can be planned safely around resident communication, permission to enter, protection, work hours, cleanup, and the property’s procedures.

Have a Barrie unit ready for review?

Submit the work order →